Between Oct. 12 and Nov. 14 1930 the eight-story 11,000-ton Indiana Bell building was shifted 52 feet south along Meridian St. and rotated 90 degrees to face New York St. Workmen used a concrete mat cushioned by Oregon fir timbers 75-ton, hydraulic jacks and rollers, as the mass moved off one roller workers placed another ahead of it. Every six strokes of the jacks would shift the building three-eights of an inch – moving it 15 inches per hour. https://www.indystar.com/story/news/history/retroindy/2014/01/07/indiana-bell/4354705/
Continue reading...Justin Wilson
Tags
5g apple arin backhaul bgp broadband cabling cambium cbrs cellular Cisco data center dns epmp equipment fcc fiber internet ipv6 isp IX LTE mikrotik network networking PDR peering podcast router routeros routing security server small cell tool tower training troubleshooting ubnt upgrade vxlan wifi wireless wisp wispa
Follow me on Instagram
Recent Posts
- WISPAPALOOZA – look back over the years
- Quality Of Service (QOS) for Internet Service Providers (ISPs)
- PDR #28: Nextlink, Chicago data center expansion, Wisper
- Why ISPs Should Totally Rely on Google and CloudFlare for DNS (Wink)
- If you are an ISP, run your own DNS resolvers
- Unpopular opinion: BGP should accept smaller than a /24
Categories
Subscribe to Blog via Email
Join 2,121 other subscribers