Some WISP CPE grounding

A discussion which comes up over and over in the WISP space is grounding and proper installation of customer CPE. The folks at perfect-10 (https://www.perfect-10.tv/) were a vendor at #WISPAPALOOZA2018.  One of the best things I have seen them in a long time is the below photo they created. This is a great illustration of how a proper CPE goes.

Water tower install with mounting frame

We recently headed up a job for a client of installing some RF elements horns, Cambium ePMP, and Baicells LTE for a client.  One of the gems of this job was the frame the client designed for the job.  We can’t take credit for this. We just think it’s cool. Some of these pictures were taken during construction, thus post clean-up.

The frame is truly an example of how WISPs are stepping up their installs to become more standardized and carrier-grade. It costs some money but is worth it in the end.